10,000 tons of cathode copper per year
Product
Cathode copper
Customer
TOO «Shagala-Mining»
Material
Copper ore
What has been implemented
- The complex was built on the basis of 20 facilities, including a crushing complex and a flotation factory.
An automated control system with digital twins was introduced.
Energy-saving pumping stations and a water recycling system were used.
Design and estimate documentation has been developed and approved.
What we did
01 Feasibility study, Fem, development of a situational plan
We assess the feasibility of the project, form the main indicators and determine the optimal location of the object.
02 Selection of basic technological equipment
We select suitable technological schemes and equipment for the effective implementation of the project.
03 3D master plan and BIM model of the facility
For ease of Use and optimization of space, we will draw up a preliminary scheme for the placement of equipment.
04 Engineering network design
Біз ресурстық ұйымдардан техникалық шарттарды алу процесін ұйымдастырамыз.
05 Environmental expertise (EIA)
We collect and analyze data about the site: geology, Geodesy, ecology and communications.
06 Supervision and documentary support
We study the natural conditions and environmental factors that affect the project.
Conclusion for business
Reducing energy consumption by 10%
The acid is restored and reused.
Increase in copper production by 8%
At this stage, taking into account the specific introduction (CapEx, OPEX, resource provision, etc.), profitability is determined and a roadmap for the development of the project is drawn up.
Construction period: 14 months.
The areas of responsibility of the project participants are fixed, which ensures the continuity and consistency of work processes.